Featured Project

Quadra Island – Solar Grid-tie

“What makes for a job well done from my perspective is that the project needs to be completed on time, stays on budget, the work site and completed work are neat and tidy and the contractor is a pleasure to work with. The Small Planet Energy Team met all of my expectations.” ~ David, Quadra Island

Objective

The goal on this property is to achieve energy independence by making use of the multiple renewable energy sources available.

The Solution

The project was completed in two phases. The first phase consisted of installing the infrastructure for a 11kw solar grid-tie system and a 7.4kw solar array. Phase two consisted of installing an additional 3.6kw of solar. Future plans include a micro-hydro system.

Equipment Used